Highbridge StudiesWhat a study costs
What a cost segregation study costs
Cost segregation is sold three ways: online tools for a few hundred dollars, fees set as a share of the tax result, and detailed studies at a flat fee, generally a few thousand dollars for a small building and more for a large one. Highbridge Studies prepares detailed studies at a flat fee for each building, quoted after the records are seen and before any work begins.
What a study costs in the market
Prices vary more than the search results suggest, because three different products share one name.
- Online tools. A few hundred dollars to a little over a thousand. You enter the purchase price and a description of the building, and the split comes from averages for that property type. No one reads the closing statement or the invoices, and no one visits. Before paying, check what the report rests on. Usually it is your own entries. The marketing often reads like a full study, so ask whether anyone reads your records or sees the building.
- A share of the tax result. Some firms set the fee as a percentage of the first-year deduction or of the projected tax effect, so the fee rises with the figures in the report. A preparer paid that way has a reason to push the figures.
- A detailed study at a flat fee. A preparer reads the records, visits the building and assigns a cost and a depreciation class to each asset, documented to the IRS Cost Segregation Audit Techniques Guide. For a small residential building this generally runs a few thousand dollars. Larger and commercial buildings cost more, and some firms charge far more than others for the same work.
What Highbridge Studies charges
A flat fee for the building, set out in the engagement letter with the scope of the work, and known before you decide to go ahead. A study is prepared only once that letter is signed.
The fee is never a percentage of the building’s basis, and it is never tied to the tax result. A study is useful only if its figures stand on the records behind them, so the fee at Highbridge Studies does not move with the outcome.
What the fee depends on
The quote reflects the work a particular building asks for.
- The size of the building and the kinds of space in it. Apartments over a store take more work than apartments alone.
- How the building came to its owner. A building that was built or renovated leaves requisitions, change orders and invoices to be read line by line. A purchased building starts from the closing statement and the appraisal.
- How much documentation there is. Records are welcome in any form and nothing needs to be sorted first.
- The number of buildings. Owners with several are quoted building by building.
Every building is visited in person, and the visit is part of the fee.
Why there is no price list
No two buildings ask for the same amount of work. A six-story elevator building finished last year with a full set of requisitions is a different job from a prewar walk-up bought as it stands. A figure given before the records are seen would be a guess, and one side or the other would pay for the guess.
Whether a study is worth its fee
That depends on the building’s depreciable basis set against the fee, and on the owner’s own tax position, which is a question for the accountant who prepares the return. On a building with a meaningful depreciable basis, the fee is generally a small part of the first-year deduction a study supports. On a small one it may not be. The cost segregation calculator gives a rough idea by property type, and if the numbers do not support a study, the preparer will say so on the first call.
How to get a figure
Call (646) 974-4208 or send a message with the address of the building and a line about how it was acquired. A first conversation is usually enough to tell whether a study makes sense. The quote follows once the records have been seen. The services page lists the documents that help, none of which is required.
Questions
- What do cost segregation studies cost in general?
- Online tools cost a few hundred dollars to a little over a thousand and rest on the owner’s own entries. Detailed studies, in which a preparer reads the records and visits the building, generally run a few thousand dollars for a small residential building and more for a large or commercial one. Some firms instead charge a share of the tax result.
- How much does a cost segregation study cost at Highbridge Studies?
- Highbridge Studies charges a flat fee for each building, quoted after the records have been seen. The amount depends on the size and type of the building, on whether it was built, renovated or bought, and on how much documentation there is to read.
- Is the fee a percentage of the building’s cost or of the tax result?
- No. The fee is never a percentage of the basis, and it is never tied to the tax result.
- When is the fee known?
- Before any work begins. The engagement letter sets out the scope of the work and the fee, and a study is prepared only once that letter is signed.